Duck Curve Now Canyon Cliffs
EPRI
“The depth of the canyon in PJM is projected to be around seventy gigawatts in 2035. Which is equal to the total peak load of New England. And the average hourly ramp rate is projected to be over ten gigawatts per hour.”