EPRI

Frontlines

Utilities face huge costs of complying with new EPA standards.

Frontlines

The Brink of Ruin?

 

 

People (July 15, 2001)

Gordon van Welie recently was appointed president and CEO of ISO New England Inc. CMS Energy Corp. elected David G. Mengebier as senior vice president of governmental and public affairs. PSEG Global recently named George P. Schaefer as senior vice president of financing and treasurer. FERC announced the appointment of its newest commissioners. And others...

The Gas-fired Future: Boom or Bust?

Last year brought prices not seen for decades. So consumers will buy less gas, just as before, and send the forecasts out the window.

1 For examples of the degree to which buildings have conservation features such as multiple glazing and exterior or interior shading and awnings the reader is referred to "A Look at Commercial Buildings in 1995: Characteristics, Energy Consumption and Energy Expenditures," DOE/EIA - 0625 (95), October 1998. For information on conservation practice in the residential sector see "A Look at Residential Energy Consumption in 1997," DOE/EIA - 0632 (97), November 1999.

News Digest

The California ISO offers a plan, but some fear that rules themselves are the problem.

 

News Digest


 

The Choice Not to Buy: Energy $avings and Policy Alternatives for Demand Response

What California would have saved-in real dollar figures-plus a look at pilot programs from around the country.

1 Also cited as contributing factors are the lack of long-term contracting, operating problems in the ISO and power exchange (PX) markets, and suggestions that owners of generation took advantage of the supply shortage and the design of California's wholesale power markets to exercise market power to drive prices higher.

Service to the 9's? Power Quality in a Tech-Wreck World

Why it's just as important for the old economy.



 

Why it's just as important for the old economy.

Mention "power quality" and the mind conjures up visions of tech hotels stuffed with Internet servers running 24/7, retrofitted into inner city industrial warehouses-buildings sturdy enough to forgive the heavy installation of custom power supply equipment and racks of batteries. Or perhaps Silicon Valley.

Surviving and Thriving in the RTO Revolution

How to design tariffs to improve reliability and attract merchant generation.

1 A representation of a generic interconnection, with thermal, hydro, and nuclear generation sharing a grid with a winter peaking load.

2 , 93 FERC 61,294, Dec. 15, 2000.

3 For a survey of methods, see J.W. Marangon Lima "Allocation of Transmission Fixed Charges: An Overview,", Vol. 11, No. 3, 1996.

Superconductors: Coming Soon to a Grid Near You?

Transmission constraints and technology developments may hasten emerging applications.


 

Transmission constraints and technology developments may hasten emerging applications.

Sure, superconductor technology might have lots of potential, but it can't do anything for me today.