sPower, developed an agreement with Hecate Energy, a leading power developer, to develop and own/operate solar PV projects. The first joint initiative is the sale to sPower of a 162-MW portfolio comprised of three projects named Beacon 1, Beacon 3 and Beacon 4. The utility scale projects, near Mojave, Calif., in Kern County, will be designed and built by Hecate, then jointly owned and operated by sPower and Hecate. Groundbreaking is scheduled for Q3 2015, with COD from March to July 2016. The Beacon projects have 25-year PPAs with the Los Angeles Department of Water and Power.