GBT

Bonneville's Balancing Act

In the Pacific Northwest, you either spill water or spill wind.

The wind power industry has been up in arms ever since the Bonneville Power Administration earlier this year announced its Interim Environmental Redispatch and Negative Pricing Policy. That policy, applicable during periods of high spring runoff and heavy water flow volumes on the Federal Columbia River Power System, calls for BPA to redispatch and curtail access to transmission for wind power generating turbines, and to replace that resource with hydroelectric power generated via BOA hydroelectric dams, in order to avoid having to divert water through dam spillways, which could threaten fish and wildlife by creating excess levels of Total Dissolved Gas (TDG), which can cause Gas Bubble Trauma. Yet the legal issue remains unclear: Does this practice imply discrimination in the provision of transmission service, or is it simply a matter of system balancing and generation dispatch? In fact, the FERC may lack jurisdiction over the dispute, as it pertains to the fulfillment of BPA’s statutory mandates.

Tres Amigas Tie Up

Synchronizing networks to bring green power to market.

In order to fully integrate wind and other dispersed sources of energy into the system, America’s patchwork transmission networks need to be more closely interconnected and synchronized. An advocate for the Tres Amigas merchant transmission project explains how the proposed facility will integrate the grid.

The Top 10 Utility Tech Challenges

Innovation must play a key role in each company.

An EPRI vice president cites areas of concern in each part of the electricity value chain. How can IOUs overcome the formidable difficulties ahead of them?