ITC Energizes Thumb Loop Transmission Line
Submitted by aburr on Thu, 2015-05-14 13:36ITCTransmission completed the Thumb Loop high-voltage transmission project with the energization of the third and final phase of the project. ITC invested $510 million to build the 345 kV line, which serves as the backbone of a system designed to meet the identified maximum wind energy potential of Michigan's Thumb region. It also will contribute to regional system reliability and facilitate wholesale market competition.