NIST

The Challenge of Implementing NERC's Cyber Standard

How to develop, implement, and operate a security program.

In May 2, 2006, the NERC board of trustees adopted the Critical Infrastructure Protection Cyber Security Standard. This article provides some answers to questions in the form of security program development, implementation, and operation.

Service to the 9's? Power Quality in a Tech-Wreck World

Why it's just as important for the old economy.



 

Why it's just as important for the old economy.

Mention "power quality" and the mind conjures up visions of tech hotels stuffed with Internet servers running 24/7, retrofitted into inner city industrial warehouses-buildings sturdy enough to forgive the heavy installation of custom power supply equipment and racks of batteries. Or perhaps Silicon Valley.

News Digest

State PUCs

ISO GUIDELINES. Marking a contrast with California, but lining up with states in the Northeast, the Iowa Utilities Board has urged that independent system operators should have authority to order redispatch to help fulfill service requirements for electric transmission. That rule came as part of a set of principles issued by the board to guide the formation of ISOs in managing electric transmission systems and preventing the exercise of market power.

Exploiting the Random Nature of Transmission Capacity

SEVERAL YEARS AGO, ENGINEERS AT AMERICAN ELECTRIC Power measured the transfer capability or transmission capacity (in this article we will use the terms interchangeably) between AEP and Commonwealth Edison. Using traditional methods, they found that the winter transmission capacity that year was 3,500 megawatts.

Then they performed a more exhaustive and nonstandard analysis. It showed that during the month of January, transmission capacity actually varied from a low of 1,600 MW (less than half the nominal amount) to a high of 6,000 MW (70 percent higher than nominal).

News Digest

PIPELINE CONSTRUCTION. Chief Judge D. Brock Hornby of the U.S. District Court in Maine, decided to allow Portland Natural Gas Transmission System access to electric transmission corridors owned by Central Maine Power Co. The access will be used to install a natural gas pipeline.

Portland received FERC approval Sept. 24 for installing and operating a 292-mile, $302-million interstate pipeline. CMP owns about 70 miles of the electric transmission corridor. The preliminary injunction, issued April 10, gives Portland access to property on CMP-owned transmission corridors.

News Digest

State Legislatures

CALIFORNIA ELECTRIC RESTRUCTURING. California Assemblywoman Diane Martinez, chairwoman of the Utilities and Commerce Committee, has introduced two new bills aimed at protecting consumers in a competitive market. But the measures already have been put on hold for this year. The first bill, AB 579, would cut rates for residential and small-volume commercial customers by 20 percent, rather than by 10 percent as promised in the state's restructuring act, AB 1890.