FERC

Transmission Tug-of-War

From EPAct to Order 1000, siting authority continues evolving.

Six years after Congress granted FERC “backstop” siting authority for electric transmission projects in the Energy Policy Act of 2005, the regulatory landscape is still evolving as a result of federal court decisions and new FERC orders. But despite a lack of certainty at the federal level, project sponsors have filed numerous applications at the state level for new transmission projects. Can these projects proceed without greater certainty at FERC?

Bench Report: Top Ten Legal Decisions of 2011

1. ‘Policy’ Guides the Grid; 2. Carbon Not a Nuisance (Yet); 3. Gigabucks for Negawatts; 4. A MOPR, Not a NOPR; 5. Ramp Up the Frequency; 6. Cap-and-Trade Still Lives; 7. Cyber Insecurity; 8. Korridor Killer; 9. The Burden Not Shared; 10. Ozone Can Wait.

Achieving Interoperability

The smart grid requires utilities and regulators to assert leadership.

Adopting an interoperable framework for the smart grid isn’t just a question of technology standardization. It’s also about navigating the legal, regulatory, and business factors that affect technology implementation. Making the smart grid work will require utilities and regulators to assert leadership.

Technology for the Masses

The consumer-centric smart grid and its challenge for regulators.

Federal and state regulators play a critical role in the evolution of the smart grid. Lawmakers face a host of questions, from deciding who owns consumer data and how it can be used, to defining a new range of regulated and unregulated utility services and applications. How much regulation will be needed to manage the transformation to a smart grid? And how much regulation will be too much?

Yes, We Have No Negawatts

When you sell demand response back to the grid, how much capacity are you now not buying?

When customers sell demand response into a regional capacity market (such as PJM’s Reliability Pricing Model, known as the RPM), how much credit should they earn for agreeing to curtail demand and alleviating stress on the grid — that is, for reducing the market’s need for generating capability and capacity reserve margin? And further, should the amount of credit depend on whether the customer works with market aggregators, known both as CSPs (“Curtailment Service Providers”) or ARCs (“Aggregators of Retail Customers”)? One view would pay customers for the full extent of their curtailment of demand — known as its “Guaranteed Load Drop” (GLD). The other would limit capacity credit to the customer’s prior load history — “Peak Load Contribution,” or PLC. The answer may well dictate whether regulators continue to treat “energy” and “capacity” as two distinct concepts.

Cap-Ex Conundrum

Does slow and steady still win the race?

When a capital-intensive industry enters an asset-building cycle, many companies will operate in the red for a few years or more. That’s not necessarily a bad thing, as cap-ex investments represent growth for shareholders. The devil is in the details, however, and companies facing a large slug of environmental compliance investments might produce disappointing returns over the next few years.

Bonneville's Balancing Act

In the Pacific Northwest, you either spill water or spill wind.

The wind power industry has been up in arms ever since the Bonneville Power Administration earlier this year announced its Interim Environmental Redispatch and Negative Pricing Policy. That policy, applicable during periods of high spring runoff and heavy water flow volumes on the Federal Columbia River Power System, calls for BPA to redispatch and curtail access to transmission for wind power generating turbines, and to replace that resource with hydroelectric power generated via BOA hydroelectric dams, in order to avoid having to divert water through dam spillways, which could threaten fish and wildlife by creating excess levels of Total Dissolved Gas (TDG), which can cause Gas Bubble Trauma. Yet the legal issue remains unclear: Does this practice imply discrimination in the provision of transmission service, or is it simply a matter of system balancing and generation dispatch? In fact, the FERC may lack jurisdiction over the dispute, as it pertains to the fulfillment of BPA’s statutory mandates.

Gas Demand Response

As more natural gas is used for power generation, more volatility can be expected in gas markets. Demand response might provide a tool for managing that volatility, but is it technically feasible? And will gas customers accept it?

In general, demand response refers to the ability of consumers to respond to a supply shortage by curtailing demand, thereby improving economic efficiency. Since the California energy crisis, demand response has been widely used in electricity markets throughout the United States and Canada.1 Recent developments in the natural gas sector suggest that the time may have come to also introduce demand response in that sector.

Vendor Neutral

(August 2011) Shaw Group completes 500 MW combined cycle plant; Pattern Energy begins building Spring Valley wind farm; AEP, Duke and TVA team up on interstate transmission line; AEP and MidAmerican contract for Texas transmission projects; Alliant contracts Open Systems International for volt-VAR control system; Alstom buys into AWS Ocean Energy; Siemens acquires shares in PV manufacturer Semprius; Lockheed Martin introduces cyber security system; plus contracts and announcements involving Elster, Itron, Suzlon, Solon, Sensus, Westinghouse Electric, Morgan Lewis and others.

Better Safe Than Compliant

Protecting the smart grid requires a broader strategy.

NERC’s critical infrastructure protection (CIP) standards set a minimum level of security performance—and only for high-voltage transmission systems, not the distribution grid. A compliance-checklist approach to security might lack the adaptability needed to combat evolving threats like the Stuxnet worm. A multi-layered, risk-based approach will provide better protection for the emerging smart grid.