DOE

Letters to the Editor

Before the hearings started, I felt the number of critical cyber assets for a medium size utility would be on the order of several thousand, not 20 as some major utilities are identifying under the CIP standards. This should be a red flag for the industry.

Sticker Shock!

Increasing prices for materials, equipment and services are driving utility infrastructure costs into uncharted territory.

The evidence is overwhelming: After a decade of relatively stable, or even declining, construction costs, the industry is now facing a prolonged period of elevated construction price tags. What are the causes behind this trend, and how might the cost increases translate into higher rates?

Biomass Fuel Foibles

Fuel-supply risks stunt the growth of biomass power.

Utilities can meet state renewable portfolio standards—and reduce greenhouse gases—by burning biomass fuel. Whether utilities are prepared to jump into the biomass game, however, depends on how effectively they can manage fuel risks.

Earning on Conservation

An earnings-equivalence model helps utilities and regulators calculate appropriate returns for conservation investments.

Traditionally, utility shareholders and their utilities have a bias toward supply-side resources as opposed to demand-side reduction programs. Reductions in demand may result in excess supply-side resources that are likely to be excluded from rate base because they do not meet the “used and useful” standard. However, there is a solution: Allow energy utilities to benefit from earnings rewards for demand-side reduction. From an earnings perspective, such a solution would place demand-side alternatives on par with supply-side projects.

Hot-Potato Policy

DOE loan guarantees degenerate into a political game.

Once upon a time, the U.S. Congress started a game of hot potato. The potato, otherwise known as the EPAct Title XVII Loan Guarantee Program, has been bouncing around Washington, D.C., since 2005. But now that the industry is getting a good look at the potato, it looks decidedly funky—stuffed with caveats and half-measures. Whether that’s good or bad depends largely on whether you believe the government belongs in the potato game in the first place.

Demand-Side Dreams

FERC would relax price caps—sending rates skyward—to encourage customers to curtail loads.

About four months ago, at a conference at Stanford University’s Center for International Development, the economist and utility industry expert Frank Wolak turned heads with a not-so-new but very outrageous idea.

The Power to Reduce CO2 Emissions: The Full Portfolio

What the U.S. electricity sector must do to significantly reduce CO2 emissions in coming decades.

The large-scale CO2 reductions envisioned to stabilize, and ultimately reverse, global atmospheric CO2 concentrations present major technical, economic, regulatory and policy challenges. Reconciling these challenges with continued growth in energy demand highlights the need for a diverse, economy-wide approach.

Solve the Seams

The big challenge facing the Northeast energy markets.

The Northeast energy markets are working hard to establish new levels of regional coordination and cooperation. The region’s concerted effort is essential to resolving some of the industry’s toughest issues since the individual markets evolved. These issues include the elimination, reduction, or bridging of seams issues that prevent the economic transfer of capacity and energy between neighboring wholesale electricity markets, or control areas, as a result of incompatible market rules or designs.

Letters to the Editor

A lengthy letter to the editor addresses whether the Energy Information Administration’s gas-market forecasts, as laid out in a recent article, are biased. The authors of the original piece, Timothy J. Considine and Frank A. Clemente, then respond to the letter.

Transmission Line-Siting Under EPACT: Shortcut or Short Circuit?

The 2005 Act, designed to streamline projects, may fall short of that goal.

The Energy Policy Act of 2005 was supposed to streamline the siting process and provide a federal “trump card” for projects delayed at the local level, but it is far from clear whether these goals have been, or will be, achieved.