Demand Response and Smart Grid Coalition

Techno-Regulation

The smart grid and the slippery business of setting industry standards.

Four years ago, Congress made its wishes known: it tabbed the National Institute of Standards and Technology to develop a set of standards for the smart grid, and then instructed FERC, the Federal Energy Regulatory Commission “adopt” those standards, but only after finding a ”sufficient consensus,” and only “as may be necessary” to assure “functionality and interoperability.” Yet what is known is not necessarily clear. Who decides if consensus prevails? What does “interoperability” mean? Should FERC’s “necessary” finding extend to retail smart grid applications, arguably outside its purview? And the biggest dispute — must standards be mandatory? — finds PJM at odds with much of the utility industry.

Vendor Neutral

(February 2011) Silver Spring integrates Itron meters; PECO picks Sensus; AT&T and Elster sign agreement; PSEG Fossil selects ABB for a multi-phase controls project; Trilliant secures equity financing and wins Burbank ARRA contract; Navigant buys BTM Consult; GE acquires SmartSignal; plus contracts and announcements from Survalent, Mitsubishi Motors, AES Energy Storage and others.

Vendor Neutral

Generation

FEI Company, a diversified scientific instruments company providing electron and ion-beam microscopes and tools for nanoscale applications, completed a multiple system installation at the Materials Ageing Institute (MAI) in France, a utility-oriented research center financed by Electricite de France, the Tokyo Electric Power Co., the Kansai Electric Power Co. and the U.S. Electric Power Research Institute.