Citi

Starting a Fire

Utilities cut support for climate-change deniers.

This summer marked the 40th anniversary of a pivotal event in the environmental movement. On June 22, 1969, the oily surface of the Cuyahoga River caught fire, drawing national attention to the plight of America’s lakes and rivers. However, clean water standards didn’t begin with the Cuyahoga River fire, the EPA or the Clean Water Act. A series of common-law nuisance lawsuits, combined with a patchwork of state laws and (weak) federal statutes, preceded the comprehensive legislation that emerged from the smoke of the Cuyahoga. Today we’re seeing a similar progression in greenhouse gas regulation, with civil suits, state initiatives and marginal federal actions apparently marching toward a national climate policy.

Federalizing the Grid

Renewable mandates will shift power to FERC but pose problems for RTOs.

A recent survey conducted by the U.S Office of Personnel Management and reported by the Washington Post on March 13 ranked the Federal Energy Regulatory Commission as eighth best of some 37 federal agencies in terms “talent,” and third in “leadership and knowledge.”

Titans of Transmission

ITC and AEP jockey for the lead in building the grid of tomorrow.

On February 9, a group of the nation’s major grid system operators released a study estimating the nation’s electric industry sector needs to spend some $80 billion—more than 10 times the size of that portion of the Obama stimulus package directed specifically at transmission construction—in order to achieve a 20 percent retail penetration for renewable wind energy in just the Eastern Interconnection.

Back to Gas

Utility turbines bridge the capacity gap.

Utilities are turning to natural gas as a bridge fuel, and to support non-dispatchable renewables.

Transmission is Bubbling

A billion-dollar ‘gold rush’ could send grid rates through the roof.

Money may be difficult to come by for Wall Street financiers in these dark days, but apparently not for electric transmission construction—at least so far. A rash of recent orders from FERC shows that generous financial incentives remain available to companies seeking to expand the nation’s grid capacity.

Buyer's Remorse

The PJM complaint and the rising cost of electric reliability.

Who says ratepayers must accept the traditional measure of electric reliability—a single one-hour outage every ten years? If shown the bill ahead of time, might they decide otherwise; that such luxury is no longer affordable? Consumers are making similar decisions about gasoline and mortgages. Why not electricity?

No Generator Left Behind

A new theory on capacity markets and the missing money.

On Wednesday May 7, FERC will host a conference in Washington, D.C. that might prove extraordinary. The commission staff promises not only to review the forward capacity markets now operating in New England and PJM—each a story unto itself—but also to discuss a new rate-making theory that has come virtually out of nowhere and which proposes to help solve the notorious “missing money” problem.

The Queue Quandary

Why developers today are often kept waiting to get projects ok’d to connect to the grid.

Late last year FERC learned that the Midwest regional grid likely would require at least 40 years — until 2050 — simply to clear its backlog of proposed gen projects awaiting a completed interconnection agreement to certify their compatibility with the interstate power grid. But grid engineers would meet that date only by shortening the process and studying multiple projects simultaneously in clusters. To apply the process literally, studying one project at a time, as envisioned by current rules, the Midwest reportedly would need 300-plus years to clear its project queue.

Iatan 2: A New Coal Model

KCP&L breaks ground on a novel structure for billion-dollar plant investments.

To the casual observer, the Iatan 2 power plant under construction in Platte County. Mo., is simply another coal-fired facility. However, when viewed by a utility executive facing seemingly non-stop global-warming headlines and news broadcasts, the 850 MW Iatan 2 looks more like a new regulatory and business model for building coal burners.

Report Slams TXU LBO

Consultant Roger Gale concludes that the TXU leveraged buyout does not provide inherent or long-term advantages to the customer.

Just when everyone thought the dust had cleared on the highly contentious leveraged buyout of TXU by Kohlberg Kravis Roberts and Co. (KKR), new challenges have sprung up from the most unexpected place.