Caithness

Bonneville's Balancing Act

In the Pacific Northwest, you either spill water or spill wind.

The wind power industry has been up in arms ever since the Bonneville Power Administration earlier this year announced its Interim Environmental Redispatch and Negative Pricing Policy. That policy, applicable during periods of high spring runoff and heavy water flow volumes on the Federal Columbia River Power System, calls for BPA to redispatch and curtail access to transmission for wind power generating turbines, and to replace that resource with hydroelectric power generated via BOA hydroelectric dams, in order to avoid having to divert water through dam spillways, which could threaten fish and wildlife by creating excess levels of Total Dissolved Gas (TDG), which can cause Gas Bubble Trauma. Yet the legal issue remains unclear: Does this practice imply discrimination in the provision of transmission service, or is it simply a matter of system balancing and generation dispatch? In fact, the FERC may lack jurisdiction over the dispute, as it pertains to the fulfillment of BPA’s statutory mandates.

Vendor Neutral

(June 2011) Duke and ATC team up to build transmission lines; AEP installs bioreactor to control selenium emissions; NextEra buys 100 MW of wind from Google; Ocean Power Technologies awards contracts for wave power array; Kansas City picks Elster; BC Hydro picks Itron; plus contracts and developments involving Tres Amigas, Ioxus, Opower and others.

Vendor Neutral

(February 2011) Silver Spring integrates Itron meters; PECO picks Sensus; AT&T and Elster sign agreement; PSEG Fossil selects ABB for a multi-phase controls project; Trilliant secures equity financing and wins Burbank ARRA contract; Navigant buys BTM Consult; GE acquires SmartSignal; plus contracts and announcements from Survalent, Mitsubishi Motors, AES Energy Storage and others.

Crisis Capital

Volatile markets call for alternative financial models.

Should the power industry adapt its approach to capital markets in this environment? The answer, of course, is yes. Multiple frameworks are necessary to establish a power company’s or project’s current cost of capital, especially under volatile capital market conditions. The analyses reveal that in today’s capital markets, it is critical to balance or combine the alternative approaches to the cost of capital in order to develop a long-term view.

The Big Build

Utility infrastructure projects face high costs, labor shortages and global competition for resources.

A huge backlog exists for utility infrastructure projects. Major players in the construction industry—ABB, Black & Veatch, Siemens, The Shaw Group and WorleyParsons—discuss the trends, both good and bad, and how they are getting the job done on badly needed projects.