Life in the Transco Age
The competitive transmission genie is out of the bottle.
FERC Orders 890 and 1000 have opened the doors to independent transcos, heralding an era of innovation to solve reliability and capacity problems.
The competitive transmission genie is out of the bottle.
Atlantic Wind and Solar began construction on portfolio 101 representing 12 utility scale rooftop solar PV assets in Ontario, Canada. The utility scale projects, comprising 12 commercial buildings in Mississauga and Brampton in Ontario, represent 1.582 MW AC and approximately 1.9 MW DC of peak power production. Capital cost on the projects are approximately CAD $9.5 million.