Fortnightly Magazine - February 1 2001
Service to the 9's? Power Quality in a Tech-Wreck World
Why it's just as important for the old economy.
Mention "power quality" and the mind conjures up visions of tech hotels stuffed with Internet servers running 24/7, retrofitted into inner city industrial warehouses-buildings sturdy enough to forgive the heavy installation of custom power supply equipment and racks of batteries. Or perhaps Silicon Valley.
Compassionate Competition?
With its own private power grid, Texas thinks it's got restructuring licked.
With its own private power grid, Texas thinks it's got restructuring licked.
Bruce W. Radford
People
News Digest
News Digest
News Digest
News Analysis
1 ISO terminology is complex and often misleading. A Stage 1 emergency occurs when the ISO does not meet its own reserve criteria. Stage 2 occurs when it cannot meet a 5 percent reserve margin. A Stage 3 takes place when it cannot meet at 1.5 percent reserve margin. An ISO emergency can take place even when local resources are available-so long as they have not been bid into its daily reserve purchasing.
Off Peak
Off Peak
February 1, 2001
Who Lost Deregulation?
Surviving and Thriving in the RTO Revolution
1 A representation of a generic interconnection, with thermal, hydro, and nuclear generation sharing a grid with a winter peaking load.
2 , 93 FERC 61,294, Dec. 15, 2000.
3 For a survey of methods, see J.W. Marangon Lima "Allocation of Transmission Fixed Charges: An Overview,", Vol. 11, No. 3, 1996.