Mitsubishi Hitachi Power Systems Americas (MHPSA) received an order from Virginia Electric and Power Company (VEPCO) for the supply of three M501J gas turbines to be installed at VEPCO's Greensville County Power Station. The three gas turbines have a projected completion date of year-end 2018 and will produce approximately 1600 MW. This order is the third MHPSA advanced design gas turbine order placed by VEPCO over the last 5 years. The other two sites, Warren County and Brunswick County Power Stations, utilize three M501GAC gas turbines combined with a steam turbine. Warren County has already achieved commercial operation and Brunswick County will follow in 2016.