Manitoba Hydro signed two major power sales with Wisconsin Public Service (WPS), a subsidiary of Integrys Energy Group. The first sale, running from 2016-2021, is for 108 MW of firm power. The second sale - which will use electricity produced by the proposed new Conawapa Generating Station on the Nelson River - is for 308 MW of firm power for up to 10-years. The 308-MW sale is scheduled to start in 2027. A previously announced 100-MW sale to WPS is scheduled to run from 2021 to 2026, bridging the gap between these two new deals.