Regulatory and rate proceedings at FERC can be time consuming and expensive, but this hurdle can be overcome.
For the natural gas infrastructure and the available pipeline system capacity to be utilized as a foundation for the reduction in power transmission congestion, there are certain issues that need to be addressed.